Network rack installation
When should you call us?
- A first network rack for new premises.
- Replacing a rack that is too small or a wall cabinet that is full.
- Equipment sitting on a shelf or on the floor, with no organization.
- Adding patch panels, switches or rack-mount equipment to an existing rack.
How we work
The rack is the heart of the infrastructure. A rack that is properly assembled and organized from day one stays readable and maintainable for years. We assemble the rack, install it in place, mount the patch panels, rack-mount equipment and accessories, then organize cable management and power.
We plan the rack layout before mounting anything: position of the patch panels, switches, cable managers and power distribution. Equipment is secured, identified and labeled, cabling is organized vertically and horizontally, and the rack is documented.
What the service includes
- Rack assembly
- Installing the rack in its location
- Planning the available space
- Mounting patch panels
- Mounting rack-mount equipment
- Installing rack accessories
- Vertical and horizontal cable management
- Preparing cable entry
- Equipment identification
- Labeling
- Organizing power distribution
- Visual inspection of the installation
- Overall consistency check
- Rack documentation
The tasks selected for your job are detailed in the quote.
How the job is carried out
- 01
Layout plan
Choice of location, rack units (U) assigned to each item and cable entry points.
- 02
Assembly
Rack assembly and positioning, fitting rails, accessories and cable managers.
- 03
Mounting
Installing patch panels, rack-mount equipment and power distribution.
- 04
Organization
Vertical and horizontal cable routing, equipment identification and labeling.
- 05
Inspection and documentation
Consistency check and hand-over of the rack documentation.
A clean, accessible, identifiable and maintainable rack, ready for patching and equipment configuration.
What is not included
- Hardware supply is specified in the quote: it can be provided by you or proposed by AVENTIK.
- Creating or modifying the electrical supply (dedicated circuit, distribution board) is a job for an electrician.
- Configuration of the installed equipment (switches, routers, firewalls, servers) is not included.
- Air conditioning or ventilation of the comms room is not part of this service.
Often combined with
Need help with network rack installation?
Describe your installation, the context and your constraints. Technical details are agreed together before any quote.
Request a service